Choose the experience
Compare targeted, open, standing and lying whole-body formats. Match posture, privacy and accessibility to your facility.
Measure the complete route
Record the room, doorways, lifts and handling constraints. Equipment dimensions are not working clearance: request an installation drawing.
Check the installation
Confirm electrical supply, available power and ventilation with the technical documentation. Electrical kW do not measure light dose; optical measurements need their own conditions.
Define the complete proposal
Ask for equipment, transport, handling, installation and support to be itemised. Confirm delivery times, warranty and service for the destination country.
Prepare the operating team
Obtain the manual, intended-use information, maintenance requirements and applicable conformity documents. Use model-specific instructions rather than a schedule taken from a study.
How we select sources
We link identifiable scientific publications and report findings and limitations, including null results. This initial collection is not a systematic review. Studies of particular devices and protocols do not establish outcomes for ARES products.